PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished stripping the Foundation wall forms at Monumental Stairs Facing West (800x600).jpg Started unbolting the Shear Wall Panels at Elev. 5-6 2nd Floor Facing South(800x600).jpg Waterproofing around foundation walls at Elev. 5-6 Facing South-West (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North-West (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing East (800x600).jpg Setting the footing forms at Elev. 7-Stair -4,5 Facing North -2 (800x600).jpg Waterproofing around foundation walls at Elev. 5-6 Facing East (800x600).jpg
Previous pageNext page Setting the footing forms at Elev. 7-Stair -4,5 Facing East (800x600)
Setting the footing forms at Elev. 7-Stair -4,5 Facing East (800x600)